Wed, 4/30 at 8:00 pm on Austin PBS Create
Westford: Abating the Old, Seeding the New
Restoring the main staircase; a visit to an orchard; installing a roof hatch to the widow's walk. (30 minutes)
Thu, 5/1 at 1:00 am on Austin PBS Create
Westford: Abating the Old, Seeding the New
Restoring the main staircase; a visit to an orchard; installing a roof hatch to the widow's walk. (30 minutes)
Thu, 5/1 at 8:00 pm on Austin PBS Create
Westford: Septic, Stairs and Subs
The installation of the new septic system; repairing the portion of the staircase that was burned in the fire; rough plumbing. (30 minutes)
Fri, 5/2 at 1:00 am on Austin PBS Create
Westford: Septic, Stairs and Subs
The installation of the new septic system; repairing the portion of the staircase that was burned in the fire; rough plumbing. (30 minutes)
Fri, 5/2 at 3:00 am on Austin PBS Create
Auburndale: Shingles, Ductwork, Lights, and a Pocket Door
Hand-patching sidewall shingles; installing ductwork for the hydronic heating and cooling system; finishing up the rough electrical with dimmable LED recessed lighting; installing a pocket door kit. (30 minutes)
Fri, 5/2 at 7:00 am on Austin PBS Create
Westford: Septic, Stairs and Subs
The installation of the new septic system; repairing the portion of the staircase that was burned in the fire; rough plumbing. (30 minutes)
Fri, 5/2 at 1:00 pm on Austin PBS Create
Westford: Septic, Stairs and Subs
The installation of the new septic system; repairing the portion of the staircase that was burned in the fire; rough plumbing. (30 minutes)
Sat, 5/3 at 3:00 am on Austin PBS Create
Westford: Septic, Stairs and Subs
The installation of the new septic system; repairing the portion of the staircase that was burned in the fire; rough plumbing. (30 minutes)
Sat, 5/3 at 4:00 am on Austin PBS HDTV
Westford: Side Hustle
Installing the new siding; using stone to make the addition more cohesive with the house; visiting a trade school in Switzerland. (30 minutes)
Sat, 5/3 at 7:30 am on Austin PBS Create
Westford: Septic, Stairs and Subs
The installation of the new septic system; repairing the portion of the staircase that was burned in the fire; rough plumbing. (30 minutes)